热门标签

单双哈希:KPower gets four-year PPA extension

时间:1个月前   阅读:6

Telegram游戏破解www.tel8.vip)是一个Telegram群组分享平台。Telegram游戏破解包括Telegram群成员导出、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram游戏破解为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

单双哈希www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

上一篇:新2网址(www.99cx.vip):When will a general election be held?

下一篇:新2手机管理端网址(www.hg108.vip):Bursa Malaysia closes broadly lower on continued profit-taking

网友评论